Eichler renovation update, Electricity, HVAC, Tile, and Paint
PG&E was nice enough to run a new cable from the power pole to our new 200amp service mast for…
PG&E was nice enough to run a new cable from the power pole to our new 200amp service mast for…
The pipe fitters showed up on Saturday and installed all of the fire sprinkler heads. They used fire-resistant CPVC pipe…
The spray-foam insulation went in this week. It is pretty amazing stuff – you can barely put a dent in…
I plan to do some more comprehensive posts detailing each process later, but here is the quick and dirty: Electrical,…
While we’re on hold waiting for building permits, we’re taking the opportunity to work on the yard. This weekend we…
We created a complete floor plan using AutoDesk software (Revit) for the building permits. It ended up taking 12 hours…
I can’t say enough good things about Anthony – besides doing a beautiful job on all of the copper plumbing…
My Dad and Uncle Dave came down from Oregon to do the wiring. They actually are very qualified as they’ve…
Here is how it looked once we finished all of the demo work. You can see some of the original…
Here are some ‘before’ pix for context. These were taken while the house was still staged with furniture by the…
We started the demo on 7/19/08 and most of it was done after two days of hard work. We had…
We’re currently in escrow on this 1961 Eichler home. We plan to start the demo the day after we close.…